Workload Migration Checklist

Migrating IT infrastructure to adapt to ever-evolving IT strategies has long been a challenge for any business. Factors such as in-house knowledge of applications, the speed of technological change in the IT industry, as well as constant emerging cloud technologies means that these migrations can quickly become complex and challenging to implement.

Zerto delivers a standardized approach to handling these challenges, providing an agnostic offering capable of providing enterprises with a truly resilient IT infrastructure. Utilizing Continuous Data Protection (CDP), the traditional migration window can be reduced from days to just a few minutes, with next to no impact on the production environment until the migration is performed.

Download this checklist for an overview to help plan a datacenter migration project and ensure accountability throughout each step.

View Now

Spirit Airlines Case Study

Spirit Airlines is the eighth largest commercial airline in North America, operating more than 400 daily flights to 60 destinations in the U.S., Latin America, and the Caribbean. After experiencing rapid business growth and an expanded datacenter footprint, Spirit Airlines needed to simplify their data migration and disaster recovery processes to provide resilience in the face of unplanned disruptions.

Download this case study to find out how Spirit Airlines built a business strategy to ensure resilience and geo-diversity for its complex IT infrastructure and systems to withstand natural disasters.

View Now

Client Story: gategroup

Garth Gray, Vice President Global IT Infrastructure and Michael Heuser, Senior IT Director of gategroup talk about the transformation of their MPLS network into a global SD-WAN with strong integration of the Microsoft Azure Cloud. The talk took place at the American headquarters of gategroup in Reston, Virginia.

Garth Gray gategroup is the leading independent global provider of products, services and solutions to airline passengers. They work directly with airlines and with their unique passengers in mind to manage complex, high-volume operations around the world. They have 165 facilities within 126 locations in 33 countries on six continents. Their operation consists primarily of airline catering facilities, running 24 × 7.

Read this case study to know more about GateGroup.

View Now

Kemet Chooses Open Systems To Optimize Performance Of Cloud Apps, Secure Cloud Connectivity, And Reduce Costs By 50%

KEMET chooses Open Systems to optimize performance of cloud apps, secure cloud connectivity and reduce costs by 50%.

As a leading global manufacturer of electronic components, KEMET Electronics Corporation has more than 15,000 employees operating at 60 locations across 16 countries. The company strives to meet the highly specialized needs of electronics makers in the telecommunications, medical, aerospace defense, and automotive markets. More than 160 patents, state-of-the-art manufacturing, and R&D facilities allow KEMET to deliver an expanding portfolio of advanced electronic solutions, including the industry’s broadest range of capacitors.

Read this customer story to know more about KEMET Electronics Corporation.

View Now

Cavium enables secure access to privileged credentials with One Identity Safeguard

The majority of headlines about cybersecurity failures center on the theft or loss of customer or citizen information, and larceny linked to money. However, for many organizations the “crown jewels” that they must protect is the intellectual property that is the true value of their businesses. Such is the case with San Jose, California-based Cavium, a processor manufacturer that services a wide range of technology solutions.

View Now

From Concept to Savings: One Large Oil Company Integrates it’s Complex Supply Chain

According to Aberdeen's chief supply chain officer survey conducted in January 2011 which surveyed 191 companies, the top two pressures dominating current supply chain operations include increased complexity and globalization (52%), and rising supply chain costs (46%) including fuel and labor. Undoubtedly, the increase in the number of trading partners is changing the nature of the dynamics between all parties in the multi-tiered global supply chain. In response to these pressures there is a growing shift in focus towards internal collaboration (cited by 70%) and external collaboration (42%) with suppliers and trading partners. This Analyst Insight will focus on some key process and technology differentiators displayed in improving supplier/partner/service product flow across an increasingly more complex, multi-tier, and cross-channel distribution network. We will showcase the advantages that one large oil and gas company was able to achieve by partnering with a solutions provider, ASCI, to build out an integrated platform.
View Now

Customer Case Study

AdvanSix needed to create its own ERP platform and turned to trusted partner Fujitsu to develop a flexible, scalable, and reliable SAP HANA® solution built on Microsoft Azure®.

Download this case study to learn more.

View Now

How the City of Sacramento Scaled it’s Online Government Services

Greg Western, website administrator for the City of Sacramento, and his small web team have now converted more than 600 paper-based forms to online services for the City. In this case study, you'll learn how his team got started on going paperless and how, two years later, the team now works with 13 different departments on an ongoing basis to digitize forms and streamline processes for citizens and staff.

The case study answers key questions such as:

  • How did your team start going paperless?
  • How did you calculate time savings for digital forms?
  • What are your most used forms?
  • How do you handle form governance and permissioning?
  • Has the accuracy of form submissions improved?
  • How have your processes changed since digitizing your forms?
  • What platforms have you integrated with SeamlessDocs?
  • What workflows do you use?
  • Did you have any accessibility issues?

View Now

Streamlined Image Management Improves Productivity and Performance for Stylight

For Stylight, a fashion and design retail search engine, uptime, performance, and customer experience are key to the bottom line. Learn how they automated their image management workflow by automatically delivering the optimal image quality, speeding up page load time by about 100 milliseconds across all locations—improving conversion rates by up to 2.2% and revenue up to 2.4%.

View Now

Streamlined Digital Asset Management Optimizes Productivity and Performance for StubHub

As StubHub evolved from a lightweight website to one that was rich with images, videos and custom views from seat locations at event venues around the world, it sought a way to streamline their image and video management. Learn how StubHub automated a time-consuming and complex image and video upload and management process, resulting in a 60% reduction in page weight and achieving a three times faster page load time—optimizing performance and user experience.

View Now

Efficient Image Management Improves Performance and Productivity for Hipcamp

When creating a website that allows campers to discover great destinations, Hipcamp put a strong emphasis on featuring high quality images that showcased the list of beautiful locations, regardless of whether users accessed the site on a desktop, tablet, or phone. Since 2015, Hipcamp has relied on Cloudinary’s image management solution to automate cropping and image optimization, enabling instant public delivery of photos, automatic tagging based on content recognition, and faster loading of webpages. In addition, Hipcamp was able to maintain the high standards it holds for the look and feel of its website.

View Now

Case Study: Anglicare

A growing organization, it had been acquiring or building new facilities to meet the increasing consumer demand. This meant that they had adopted multiple incumbent data systems that were not linked or integrated.

Anglicare needed:

  • A way to bring all the facilities in their portfolio together in one centralized platform
  • To identify what information was missing or incorrect in their existing handover documentation
  • To ensure that each facility, and the organization as a whole, was compliant with the Federal Aged Care Act
  • A strategic and efficient approach to ongoing maintenance planning and budgeting

View Now

Case Study: The Prince of Wales Hospital

Value Added: One central system to efficiently manage construction, assets and defects. OmTrak was primarily utilized to provide enhanced project hand over documentation accuracy and was integrated with existing client FM systems.

View Now

Case Study: Urology Clinic

Value Added: One central system to efficiently manage construction, assets and defects. OmTrak was primarily utilized to provide enhanced project hand over documentation accuracy and was integrated with existing client FM systems.

View Now